英語(yǔ)試題:youhavejustfinishedmostoftheworkonanewsy
試題分類:英語(yǔ)You have just finished most of the work on a new system integration project when the seller comes to you with detailed procedures for close out of the contract. The contract included closeout procedures. What should the project manager do?
A、 Revise the closeout procedures after getting management’s approval.
B、 Get a change order.
C、 Create new procedures that are more complete.
D、 Assess the quality of the seller’s new detailed procedures and if they are better than the current procedures.use them.
試題出處:
http://www.ruantiku.com/shiti/3367612495.html在下面提交答題后即可查看答案與考友試題分析
信管網(wǎng)參考答案:B
信管網(wǎng)解析:進(jìn)入軟題庫(kù)查看解析
查看更多英語(yǔ)試題>>
掃碼關(guān)注公眾號(hào)
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
相關(guān)內(nèi)容