系統(tǒng)集成項目管理工程師每日一練(2015-4-19)內(nèi)容
第1題: Estimating schedule activity costs involves developing an(1 )of the costs of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. For example, in most application areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. The cost estimating process considers whether the expected savings can offset the cost of the additional design work. Cost estimates are generally expressed in units of (2 )to facilitate comparisons both within and across projects. The(3 )describes the business need, justification, requirements, and current boundaries for the project. It provides important information about project requirements that is considered during cost estimating.
(1)A. accuracy B. approximation C. specification D. summary
(2)A. activity B. work C. currency D. time
(3)A. project scope statement
B. statement of work
C. project management plan
D. project policy
標準化工作的任務(wù)是制定標準、組織實施標準和對標準的實施進行監(jiān)督,( )是指編制計劃,組織草擬,審批、編號、發(fā)布的活動。
A. 制定標準
B. 組織實施標準
C. 對標準的實施進行監(jiān)督
D. 標準化過程
2005年5 月4 日,張某向中國專利局提出發(fā)明專利申請;其后,張某對該發(fā)明作了改進,于2006年5 月4 日又就其改進發(fā)明向中國專利局提出申請時,可享有( )。
A.兩項專利權(quán)
B.優(yōu)先使用權(quán)
C.國際優(yōu)先權(quán)
D.國內(nèi)優(yōu)先權(quán)
如果產(chǎn)品范圍做了變更,下一步應(yīng)該調(diào)整( )。
A.項目范圍
B.進度表
C.SOW
D.質(zhì)量基準
在國家信息化體系六要素中,( )是國家信息化的核心任務(wù),是國家信息化建設(shè)取得實效的關(guān)鍵。
A. 信息技術(shù)和產(chǎn)業(yè)
B. 信息資源的開發(fā)和利用
C. 信息人才
D. 信息化政策法規(guī)和標準規(guī)范
To ensure the project team provide the functionlity the customer expects in a new prece of software, the project manager ask the customer for sing-off on the design crieria.There documents are( ).
A.technical speifications
B.performance specifications
C.product descriptions
D.quality assurance
以下關(guān)于文檔管理的描述中,( )是正確的。
A.程序源代碼清單不屬于文檔
B.文檔按項目周期角度可以分為開發(fā)文檔和管理文檔兩大類
C.文檔按重要性和質(zhì)量要求可以分為正式文檔和非正式文檔
D.《軟件文檔管理指南》明確了軟件項目文檔的具體分類
Risk management allows the project manager and the project team not to( ).
A.eliminate most risks during the planning phase of the project
B.identify project risks
C.identify impacts of various risks
D.plan suitable responses
( )由電纜連接器和相關(guān)設(shè)備組成,把各種不同的公共系統(tǒng)和設(shè)備連接起來其中包括電信部門的光纜,同軸電纜,程控交換機等。
A、建筑群子系統(tǒng)
B、設(shè)備間子系統(tǒng)
C、垂直干線子系統(tǒng)
D、工作區(qū)子系統(tǒng)
項目工作說明書是對項目提供的產(chǎn)品、成果或服務(wù)的描述,其內(nèi)容一般不包括( )。
A.服務(wù)人員
B.技術(shù)方案選擇
C.驗收標準
D.收費及付款方式
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學員考試保駕護航。面授、直播&錄播,多種班型靈活學習,滿足不同學員考證需求,降低課程學習難度,使學習效果事半功倍。
發(fā)表評論 查看完整評論 | |
关于我们 ┊ 付款方式 ┊ 联系我们 ┊ 加入我们 ┊ 网站声明 ┊ QQ学习群 ┊ 网站地图 ┊ 最近更新 |
客服热线:400-880-6318 QQ:800184589 微信:270019001 文章或图片如有侵权,请第一时间联系删除 |
Copyright ©2010-2022 信息化项目管理专业网站 - 信管网 All Rights Reserved 湘ICP备15005302号-9 湘公网安备 43010402000418号 |
![]() |