試題1: 根據(jù)《GB/T19000-ISO9000(2000)》的定義,質(zhì)量管理是指確立質(zhì)量方針及實(shí)施質(zhì)量方針的全部職能及工作內(nèi)容,并對(duì)其工作效果進(jìn)行( )的一系列工作。
A.考核和評(píng)價(jià)
B.評(píng)價(jià)和記錄
C.預(yù)測(cè)和評(píng)價(jià)
D.評(píng)價(jià)和改進(jìn)
網(wǎng)上訂票系統(tǒng)為每一位訂票者提供了方便快捷的訂票業(yè)務(wù),這種電子商務(wù)的類型屬于()
A、B2C
B、B2B
C、C2C
D、C2B
項(xiàng)目合同評(píng)審是項(xiàng)目管理中一項(xiàng)重要工作,其中不包括()。
A.確認(rèn)合同的需求
B.進(jìn)行初步的項(xiàng)目任務(wù)分解
C.對(duì)合同條款進(jìn)行分析
D.對(duì)自身的資源和能力進(jìn)行確認(rèn)
iSCSI和SAN 適用的協(xié)議分別為( )。
A.TCP/IP,SMTP
B.TCP/IP,F(xiàn)C
C.UDP,SMTP
D.UDP,F(xiàn)C
信息化是人類社會(huì)發(fā)展的一個(gè)高級(jí)進(jìn)程,它的目標(biāo)是()
A.建設(shè)基于現(xiàn)代信息技術(shù)的先進(jìn)社會(huì)生產(chǎn)工具
B.創(chuàng)建信息時(shí)代的社會(huì)生產(chǎn)力
C.推動(dòng)社會(huì)生產(chǎn)關(guān)系及社會(huì)上層建筑的改革
D.使國(guó)家綜合實(shí)力、社會(huì)文明素質(zhì)和人民生活質(zhì)量全面達(dá)到現(xiàn)代化水平
()is the process of implementing risk response plans,tracking identified risks,monitoring residual risk,identifying new risk,and evaluating risk process effectiveness throughout the project.
A、Identity risks
B、Control risks
C、Plan risk responses
D、Plan risk management
Estimating schedule activity costs involves developing an(1 )of the costs of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. For example, in most application areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. The cost estimating process considers whether the expected savings can offset the cost of the additional design work. Cost estimates are generally expressed in units of (2 )to facilitate comparisons both within and across projects. The(3 )describes the business need, justification, requirements, and current boundaries for the project. It provides important information about project requirements that is considered during cost estimating.
(1)A. accuracy B. approximation C. specification D. summary
(2)A. activity B. work C. currency D. time
(3)A. project scope statement
B. statement of work
C. project management plan
D. project policy
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門(mén)公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛(ài)好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書(shū)、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過(guò)深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |