試題1
某公司準(zhǔn)備實(shí)現(xiàn)從傳統(tǒng)項目管理到敏捷項目管理的轉(zhuǎn)型,但成員之前都從未接觸過敏捷方法,敏捷教練安排組織成員進(jìn)行了為期兩個月的培訓(xùn)學(xué)習(xí),接下來他應(yīng)該怎么做?查看答案
試題參考答案:C
試題2
一家公司任命項目經(jīng)理管理一個預(yù)算為2000萬美元、持續(xù)時間長達(dá)36個月的高優(yōu)先級項目。在項目執(zhí)行過程中項目經(jīng)理意識到其中一個或兩個制約因素可能都不現(xiàn)實(shí)。項目經(jīng)理首先應(yīng)該怎么做?()查看答案
試題參考答案:B
試題3
在與關(guān)鍵項目相關(guān)方的會議上.項目經(jīng)理介紹了項目的成本效益分析;一名項目相關(guān)方指出,投資回報率遠(yuǎn)低于預(yù)期。項目經(jīng)理應(yīng)該怎么做?查看答案
試題參考答案:B
試題4
A project manager has an agreement with a third-party supplier to deliver parts within six months. During the implementation phase,the project is cancelled. However,the supplier has already started work on this order. What should the project manager do next?查看答案
試題參考答案:A
試題5
While working with the project team to prepare a network diagram, the project manager notices a series of activities can be performed in parallel, but must be finished in a specific sequence. What activity sequencing method is required?查看答案
試題參考答案:B
試題6
A project is delayed and a change is needed to obtain the desired quality level of the deliverables. The project manager issues a formal change request and communications the change to all stakeholders. The project manager then learns that this communications approach failed to meet stakeholders' expectations. What should the project manager do?查看答案
試題參考答案:A
試題7
項目由于不能及時獲得所需資源,已經(jīng)不能繼續(xù)做下去。項目經(jīng)理想知道是否符合關(guān)閉項目的標(biāo)準(zhǔn),應(yīng)該查閱以下哪個文件?()查看答案
試題參考答案:C
試題8
A supplier activates the project manager that,to meet the requested specifications.replacement of a specific material is required,What should the project manager to ensure that the co st baseline is unaffected?查看答案
試題參考答案:D
試題9
在進(jìn)行規(guī)劃風(fēng)險應(yīng)對時,你知道一個關(guān)鍵任務(wù)會對項目完工產(chǎn)生關(guān)鍵影響。所以,你準(zhǔn)備了一個彈回計劃,它包括以下各種可能,除了∶查看答案
試題參考答案:D
試題10
A project manager facilitates a workshop with stakeholders t o gather product requirements and develop a requirements traceability matrix. The system developer was unable to attend the workshop, but requested a copy of the minutes to review and validate the output. The system developer then provides feedback that the listed functional requirements do not make sense when competed against the user requirements. What should the project manager do to address this?查看答案
試題參考答案:B
信管網(wǎng)訂閱號
信管網(wǎng)視頻號
信管網(wǎng)抖音號
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評論 查看完整評論 | |