PMP?每日一練試題內(nèi)容(2022/8/31)
試題1
項目經(jīng)理參加—個客戶的新系統(tǒng)開發(fā)項目的需求收集.,項目經(jīng)理意識到來自多個部門的不同客戶對需求有不同理解。項目經(jīng)理接下來應(yīng)該怎么做?查看答案
試題參考答案:C
試題2
The sponsor's role on a project is BEST described as:項目發(fā)起人的最佳角色為∶查看答案
試題參考答案:B
試題3
After implementation of the project's first deliverable, there appears to be a misunderstanding among stakeholders regarding the project's specifications, time, and costs. Which of the following must be revised?查看答案
試題參考答案:C
試題4
公司安排一個試點團隊,嘗試從瀑布模式過渡到敏捷實踐,希望在整個組織內(nèi)建立敏捷實踐,而不是破壞其文化和規(guī)范。試點團隊?wèi)?yīng)該如何實現(xiàn)這一點?查看答案
試題參考答案:D
試題5
The duration of a project is five months, The total cost initially allocated was US$30,000.The project is in the third month. The total expenditure in the project for the first two months is US$12,500.The project is ahead of schedule and on bud get for work completed.What is the cost variance of the project?查看答案
試題參考答案:C
試題6
以下哪個活動會經(jīng)常使用0、1、2、3、5、8序列查看答案
試題參考答案:D
試題7
項目中有一些團隊成員被分配到多個項目.在關(guān)鍵項目階段,由于對該項目的參與程度,一名成員無法完成可交付成果,在規(guī)劃階段,項目經(jīng)理應(yīng)制定下列哪—項?查看答案
試題參考答案:B
試題8
一個超出預(yù)算的項目還未完成,由于供應(yīng)商合同是成本加利潤合同,項目經(jīng)理應(yīng)如何拯救項目?查看答案
試題參考答案:A
試題9
在項目規(guī)劃階段,一名主題專家(SME)對關(guān)鍵里程碑不切實際的時間表可能導(dǎo)致嚴(yán)重的交付延誤表示擔(dān)心。若要預(yù)防這個問題,項目經(jīng)理事先應(yīng)該做什么?查看答案
試題參考答案:D
試題10
管理儲備一般用于:查看答案
試題參考答案:D
信管網(wǎng)訂閱號
信管網(wǎng)視頻號
信管網(wǎng)抖音號
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學(xué)員考試保駕護航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評論 查看完整評論 | |