PMP?每日一練試題內(nèi)容(2022/12/9)
試題1
兩個(gè)團(tuán)隊(duì)成員之間存在個(gè)人沖突。這兩名團(tuán)隊(duì)成員互相不說(shuō)話,項(xiàng)目經(jīng)理預(yù)計(jì)到這將對(duì)項(xiàng)目執(zhí)行產(chǎn)生直接影響。團(tuán)隊(duì)成員正在使用下列哪項(xiàng)沖突解決技巧?查看答案
試題參考答案:A
試題2
During project execution.the customer requests a minor change.After performing a high-level review.the developer deter mines that the effort to make the change has minimal impact and can be absorbed What should the project manager do next?查看答案
試題參考答案:D
試題3
The project has been challenging to manage. Everyone has been on edge to complete the project on time. Unfortunately,t he tension has grown to the point where team meetings have become shouting matches and little work is accomplished during the meetings. One team member asks to be excused from future team meetings, as all the shouting upsets him. Meanwhile,the sponsor has asked to attend team meetings in order to better understand how the project is going and the issues involved in completing the project, and the customer has started discussions about adding scope to the project. In this situation, it would be best for the project manager to:()查看答案
試題參考答案:C
試題4
在項(xiàng)目執(zhí)行中途項(xiàng)目經(jīng)理發(fā)現(xiàn)一種方式,可以解決并避免一個(gè)重復(fù)發(fā)生的組織問(wèn)題.項(xiàng)目經(jīng)理下—步應(yīng)該怎么做?查看答案
試題參考答案:A
試題5
在一個(gè)施工項(xiàng)目的執(zhí)行階段,由于環(huán)境問(wèn)題當(dāng)?shù)鼐用裣MV乖擁?xiàng)目。項(xiàng)目經(jīng)理應(yīng)該怎么做?查看答案
試題參考答案:A
試題6
一次迭代工作中,一名團(tuán)隊(duì)成員識(shí)別到一項(xiàng)風(fēng)險(xiǎn)。敏捷項(xiàng)目經(jīng)理應(yīng)該執(zhí)行下面那個(gè)分析?查看答案
試題參考答案:C
試題7
A project is made of three activities.Activity A is lasting for 5 weeks, activity B is lasting for 6 weeks, activity C is lasting for 7 weeks, the taxis is A-B-C.While,it will take 1 week for resource distribution of activity B, and activity C will start in one week after the beginning of activity B. What is the shortest time limit for this project?查看答案
試題參考答案:C
試題8
為了確保成功交付產(chǎn)品,客戶要求對(duì)需求進(jìn)行重要更新,項(xiàng)目經(jīng)理應(yīng)該怎么做?查看答案
試題參考答案:D
試題9
你作為項(xiàng)目經(jīng)理接手了一個(gè)已經(jīng)完成近50%的項(xiàng)目。因?yàn)檫@個(gè)項(xiàng)目報(bào)告說(shuō)有很多質(zhì)是問(wèn)題,你打算審查經(jīng)過(guò)這么長(zhǎng)時(shí)間有什么樣的趨勢(shì)和偏差。下列哪一個(gè)工具對(duì)你是最有用的?查看答案
試題參考答案:B
試題10
為了使新確定的相關(guān)方盡早參與項(xiàng)目,scrum master建議邀請(qǐng)他們參加即將舉行的沖刺審查會(huì)議,以向相關(guān)方證明團(tuán)隊(duì)正在朝著正確的方向發(fā)展,并從相關(guān)方那里獲得有關(guān)團(tuán)隊(duì)工作完成情況的反饋。以下哪個(gè)是邀請(qǐng)相關(guān)方參加本次會(huì)議的另一個(gè)原因?查看答案
試題參考答案:D
信管網(wǎng)訂閱號(hào)
信管網(wǎng)視頻號(hào)
信管網(wǎng)抖音號(hào)
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門(mén)公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛(ài)好者、大學(xué)生提供專(zhuān)業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書(shū)、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專(zhuān)業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過(guò)深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |