信息系統(tǒng)項目管理師每日一練試題內(nèi)容(2023/11/23)
試題1
()is an open , distributed ledger that can record transactions between two parties efficiently and in a verifiable and permanent way.查看答案
試題參考答案:B
試題2
Self-driving technologies are important for the research and development in the field of()。查看答案
試題參考答案:C
試題3
關(guān)于云計算的描述,不正確的是( )查看答案
試題參考答案:C
試題4
變更初審的主要目的是()。查看答案
試題參考答案:A
試題5
在可作為控制質(zhì)量過程輸入的項目文件中,()可用于判斷質(zhì)量目標(biāo)的實現(xiàn)程度。查看答案
試題參考答案:C
試題6
The project ( )is a key input to quality planning since it documents major project deliverables, the project objectives that serve to define important stakeholder requirements, thresholds, and acceptance criteria.
A. work performance information
B. scope statement
C. change requests
D. process analysis
查看答案
試題參考答案:B
試題7
要把整個項目工作分解為工作包,通常需要開展的活動為:()。查看答案
試題參考答案:B
試題8
( )不屬于定性風(fēng)險分析的技術(shù)。查看答案
試題參考答案:D
試題9
干系人對項目的影響能力通常在項目()階段最大。查看答案
試題參考答案:A
試題10
一個項目進入第6個月,由于成本問題,一個干系人提出削減項目組件,項目經(jīng)理確認(rèn)削減這些組件會導(dǎo)致項目目標(biāo)無法完全實現(xiàn),并影響市場表現(xiàn)。項目經(jīng)理下一步應(yīng)該怎么做?()查看答案
試題參考答案:B
信管網(wǎng)訂閱號
信管網(wǎng)視頻號
信管網(wǎng)抖音號
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學(xué)員考試保駕護航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評論 查看完整評論 | |