系統(tǒng)集成項(xiàng)目管理工程師當(dāng)天每日一練試題地址:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=2
往期系統(tǒng)集成項(xiàng)目管理工程師每日一練試題匯總:m.xiexiliangjiufa.com/class/27/e2_1.html
系統(tǒng)集成項(xiàng)目管理工程師每日一練試題(2025/3/18)在線測試:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=2&day=2025/3/18
點(diǎn)擊查看:更多系統(tǒng)集成項(xiàng)目管理工程師習(xí)題與指導(dǎo)
系統(tǒng)集成項(xiàng)目管理工程師每日一練試題內(nèi)容(2025/3/18)
試題1
根據(jù)合同法規(guī)定,( )不屬于違約責(zé)任的承擔(dān)方式。
A.繼續(xù)履行
B.采取補(bǔ)救措施
C.支付約定違約金或定金
D.終止合同
查看答案
試題參考答案:D
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=2&day=2025/3/18
試題2
在.NET架構(gòu)中,( )給開發(fā)人員提供了一個統(tǒng)一的、面向?qū)ο蟮?、層次化的、可擴(kuò)展的編程接口。
A.通用語言規(guī)范
B.基礎(chǔ)類庫
C.通用語言運(yùn)行環(huán)境
D.ADO.NET
查看答案
試題參考答案:B
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=2&day=2025/3/18
試題3
關(guān)于標(biāo)準(zhǔn)分級與類型的描述,不正確的是()。查看答案
試題參考答案:C
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=2&day=2025/3/18
試題4
在云計(jì)算服務(wù)中,“向用戶提供虛擬的操作系統(tǒng)”屬于()。查看答案
試題參考答案:B
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=2&day=2025/3/18
試題5
傳輸控制TCP協(xié)議和用戶數(shù)據(jù)報(bào)UDP協(xié)議是互聯(lián)網(wǎng)傳輸層的主要協(xié)議。下面關(guān)于TCP和UDP的說法中,( )是不正確的
A、TCP是面向連接的協(xié)議,UDP協(xié)議是無連接的協(xié)議
B、TCP能夠保證數(shù)據(jù)包到達(dá)目的地不錯序,UDP不保證數(shù)據(jù)的傳輸正確
C、TCP協(xié)議傳輸數(shù)據(jù)包的速度一般比UDP協(xié)議傳輸速度快
D、TCP保證數(shù)包傳輸?shù)恼_性,UDP在傳輸過程中可能存在丟包現(xiàn)象
查看答案
試題參考答案:C
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=2&day=2025/3/18
試題6
( )屬于《合同法》規(guī)定的合同內(nèi)容。
A.風(fēng)險責(zé)任的承擔(dān)
B.爭議解決方法
C.驗(yàn)收標(biāo)準(zhǔn)
D.測試流程
查看答案
試題參考答案:B
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=2&day=2025/3/18
試題7
In china,the security protection level of information system is divided into()levels.
A、3查看答案
試題參考答案:C
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=2&day=2025/3/18
試題8
系統(tǒng)的( )是指系統(tǒng)可能存在著喪失結(jié)構(gòu)、功能、秩序的特性,這個特性往往是隱藏不易被外界告知的。查看答案
試題參考答案:A
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=2&day=2025/3/18
試題9
The earned value technique is a commonly used method of performance measurement. It integrates project scope, cost, and schedule measures to help the project management team assess project performance. If a project ’ s Schedule Performance Index(SPI=EV/PV) value less than 1.0, it means that ( ).
A.the project is ahead of its planned schedule
B.less work was completed than was planned
C.the cost overrun for work completed
D.the cost under-run of performance to date
查看答案
試題參考答案:B
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=2&day=2025/3/18
試題10
()is not included in the new information technology.查看答案
試題參考答案:C
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=2&day=2025/3/18
信管網(wǎng)訂閱號
信管網(wǎng)視頻號
信管網(wǎng)抖音號
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評論 查看完整評論 | |