系統(tǒng)集成項(xiàng)目管理工程師當(dāng)天每日一練試題地址:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=2
往期系統(tǒng)集成項(xiàng)目管理工程師每日一練試題匯總:m.xiexiliangjiufa.com/class27-2-1.aspx
系統(tǒng)集成項(xiàng)目管理工程師每日一練試題(2019/2/25)在線測(cè)試:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=2&day=2019/2/25
系統(tǒng)集成項(xiàng)目管理工程師每日一練試題內(nèi)容(2019/2/25)
試題1: ( )are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion; they may also exert influence over the project and its results.
A. Controls
B. Baselines
C. Project stakeholders
D. Project managers
甲企業(yè)開發(fā)出某一新產(chǎn)品,并投入生產(chǎn)。乙企業(yè)在甲企業(yè)之后三個(gè)月也開發(fā)出同樣的新產(chǎn)品,并向?qū)@块T提交專利權(quán)申請(qǐng)。在乙企業(yè)提交專利權(quán)申請(qǐng)后的第五日,甲企業(yè)向該專利部門提交了與乙企業(yè)相同專利申請(qǐng)。按照專利法有關(guān)條款,( )獲得專利申請(qǐng)權(quán)。
A. 甲乙企業(yè)同時(shí)
B. 乙企業(yè)
C. 甲乙企業(yè)先后
D. 甲企業(yè)
( )能最準(zhǔn)確地計(jì)算活動(dòng)的歷時(shí)(AD)。
A.AD=工作量/人員生產(chǎn)率
B.AD=工作量/人力資源數(shù)量
C.AD=(最樂觀時(shí)間+ 4最可能時(shí)間+最悲觀時(shí)間)/ 6
D.AD=人員生產(chǎn)率×項(xiàng)目規(guī)模
一般來說,以下不包含在服務(wù)級(jí)別協(xié)議中的是( )。
A.服務(wù)需求方要求7×24小時(shí)的服務(wù)
B.服務(wù)響應(yīng)時(shí)間不能超過30分鐘
C.發(fā)生一起超時(shí)事件罰款300元
D.明確提供服務(wù)人員的類別
某信息系統(tǒng)集成項(xiàng)目采用掙值分析技術(shù)進(jìn)行成本控制,假設(shè)當(dāng)前狀態(tài)數(shù)據(jù)如下表所示,則該項(xiàng)目的CPI、EAC、當(dāng)前項(xiàng)目的狀態(tài)分別是( )。
A.0.8,12500元,進(jìn)度滯后且成本超支
B.0.8,12500元,進(jìn)度提前且成本超支
C.1.25,12500元,進(jìn)度滯后且成本低于預(yù)算
D.1.25,12500元,進(jìn)度提前且成本低于預(yù)算
掙值管理是一種綜合了范圍、時(shí)間、成本績(jī)效測(cè)量的方法,通過與計(jì)劃完成的工作量、實(shí)際掙得的收益、實(shí)際的成本進(jìn)行比較,可以確定成本進(jìn)度是否按計(jì)劃執(zhí)行。下圖中標(biāo)號(hào)所標(biāo)示的區(qū)間依次應(yīng)填寫( )。
A、①進(jìn)度落后 ②成本差CV ③進(jìn)度差SV
B、①成本差CV ②進(jìn)度差SV ③進(jìn)度落后時(shí)間
C、①進(jìn)度差SV ②成本差CV ③進(jìn)度落后時(shí)間
D、①進(jìn)度落后 ②進(jìn)度差SV ③成本差CV
與制造資源計(jì)劃MRPⅡ相比,企業(yè)資源計(jì)劃ERP 最大的特點(diǎn)是在制定計(jì)劃時(shí)將( )考慮在一起,延伸管理范圍。
A. 經(jīng)銷商
B. 整個(gè)供應(yīng)鏈
C. 終端用戶
D. 競(jìng)爭(zhēng)對(duì)手
某單位的百兆以太網(wǎng)信號(hào)類型為基帶,電纜類型為非屏蔽超五類雙絞線,電纜連接器類型為RJ-45。該單位需將其升級(jí)為千兆以太網(wǎng),則升級(jí)為( )網(wǎng)絡(luò)的升級(jí)成本最低。
A. 1000BaseTCX B. 1000BaseT C. 1000BaseSX D. 1000BaseLX
The uncertainty of an event is measured by its probability of occurrence and is inversely proportional to that. The more uncertain an event is. The more information is required to resolve uncertainty of that event. The amount of information is measured in ()
A、possibility
B、bits
C、bps
D、probability
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |