系統(tǒng)集成項目管理工程師每日一練試題內(nèi)容(2020/12/23)
試題1: 系統(tǒng)運(yùn)行安全的關(guān)鍵是管理,下列關(guān)于日常安全管理的做法,不正確的是( )。
A.系統(tǒng)開發(fā)人員和系統(tǒng)操作人員應(yīng)職責(zé)分離
B.信息化部門領(lǐng)導(dǎo)安全管理組織,一年進(jìn)行一次安全檢查
C.用戶權(quán)限設(shè)定應(yīng)遵循“最小特權(quán)”原則
D.在數(shù)據(jù)轉(zhuǎn)儲、維護(hù)時要有專職安全人員進(jìn)行監(jiān)督
"需要時,授權(quán)實(shí)體可以訪問和使用的特性"指的是信息安全的( )。
A.保密性
B.完整性
C.可用性
D.可靠性
( )指的是為確保項目工作的未來績效符合項目管理計劃而進(jìn)行的有目的的活動。
A、糾正措施
B、預(yù)防措施
C、缺陷補(bǔ)救
D、功能完善
按照標(biāo)準(zhǔn)GB/T 16260.1《軟件過程 產(chǎn)品質(zhì)量 第1部分質(zhì)量模型》規(guī)定,軟件產(chǎn)品的“安全性”屬性屬于()評價內(nèi)容
A、外部質(zhì)量
B、內(nèi)部質(zhì)量
C、過程質(zhì)量
D、使用質(zhì)量
Project ( ) Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.
A.Integration
B.Scope
C.Configuration
D.Requirement
()不是軟件質(zhì)量保證的主要職能
A、檢查開發(fā)和管理活動是否與已定的過程策略、標(biāo)準(zhǔn)一致
B、檢查工作產(chǎn)品是否遵循模板規(guī)定的內(nèi)容和格式
C、檢查開發(fā)和管理活動是否與已定的流程一致
D、檢查關(guān)鍵交付物的質(zhì)量
Estimating schedule activity costs involves developing an(1 )of the costs of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. For example, in most application areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. The cost estimating process considers whether the expected savings can offset the cost of the additional design work. Cost estimates are generally expressed in units of (2 )to facilitate comparisons both within and across projects. The(3 )describes the business need, justification, requirements, and current boundaries for the project. It provides important information about project requirements that is considered during cost estimating.
(1)A. accuracy B. approximation C. specification D. summary
(2)A. activity B. work C. currency D. time
(3)A. project scope statement
B. statement of work
C. project management plan
D. project policy
目前的快速以太網(wǎng)(1000BASE-T)使用交換機(jī)來組網(wǎng),這樣做的目的不是為了(1)。此時以太網(wǎng)的拓?fù)浣Y(jié)構(gòu)類似(2)
(1)A.減少沖突
B.提高網(wǎng)絡(luò)速度
C.提高網(wǎng)絡(luò)使用效率
D.減少IP地址消耗
(2)A.星型
B.總線型
C.環(huán)型
D.網(wǎng)狀型
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評論 查看完整評論 | |