女人久久久www免费人成看片,国内自拍偷拍网,国产一区二区三区免费在线观看,欧美精品三区四区,91久久国产综合久久91,欧美成人精品第一区二区三区 ,美女成人在线观看

軟題庫 移動APP 掃碼下載APP 隨時隨地移動學(xué)習(xí) 培訓(xùn)課程
試卷名稱 2011年下半年系統(tǒng)架構(gòu)設(shè)計(jì)師考試上午真題試題(綜合知識)
考試中心《2011年下半年系統(tǒng)架構(gòu)設(shè)計(jì)師考試上午真題試題(綜合知識)》在線考試
試卷年份2011年下半年
試題題型【單選題】
試題內(nèi)容

Information systems design is defined as those tasks that focus on the specification of a detailed computer-based solution. Typically, there are four systems design tasks for in-house development.
1) The first task is to specify (1), which defines the technologies to be used by one, more , or all information systems in terms of their data, process, interfaces, and network components. This task is accomplished by analyzing the data models and process models that are initially created during requirements analysis.
2) The next systems design task is to develop the (2). The purpose of this task is to prepare technical design specifications for a database that will be adaptable to future requirements and expansion.
3) Once the database prototype has been built, the systems designer can work closely with system users to develop input, output and dialogue specifications. The (3) must be specified to ensure that the outputs are not lost, misrouted, misused, or incomplete.
4) The fourth design task involves packaging all the specifications from the previous design tasks into a set of specifications that will guide the (4) activities during the following phases of the systems development methodology.
Finally, we should (5) and update the project plan accordingly. The key deliverable should include a detailed plan for the construction phase that should follow.
(1)A. an application architecture
B. a distributed system
C. a system scope
D. a system physical model

(2)A. database design specifications
B. database organization decisions
C. data structure specifications
D. data distribution decisions

(3)A. format and layout
B. transaction details
C. additional instructions
D. internal controls

(4)A. system administrator’s
B. system analyst’s
C. computer programmer’s
D. system designer’s

(5)A. adjust the project schedule
B. reevaluate project feasibility
C. evaluate vendor proposals
D. select the best vendor proposal


相關(guān)試題

推薦文章
合作網(wǎng)站內(nèi)容