第1題:
一般將成本管理劃分為成本估算、成本預(yù)算、成本控制幾個(gè)過(guò)程。以下關(guān)于成本預(yù)算描述,不正確的是( )。
A.當(dāng)項(xiàng)目具體工作無(wú)法確定時(shí),無(wú)法進(jìn)行成本預(yù)算
B.成本基準(zhǔn)計(jì)劃可以作為度量項(xiàng)目績(jī)效 依據(jù)
C.管理儲(chǔ)備是為范圍和成本 潛在變化而預(yù)預(yù)算,因此需要體現(xiàn)在項(xiàng)目成本基線里
D.成本預(yù)算過(guò)程完成后,可能會(huì)引起項(xiàng)目管理計(jì)劃更新
解析與討論:http://m.xiexiliangjiufa.com/st/173.html
參考答案:C
第2題:
On some projects, especially ones of smaller scope, activity sequencing, activity resource estimating, activity duration estimating, and ( ) are so tightly linked that they are viewed as a single process that can be performed by a person over a relatively short period of time.
A.time estimating
B.cost estimating
C.project planning
D.schedule development
解析與討論:http://m.xiexiliangjiufa.com/st/203.html
參考答案:D
第3題:
The project ( )is a key input to quality planning since it documents major project deliverables, the project objectives that serve to define important stakeholder requirements, thresholds, and acceptance criteria.
A. work performance information
B. scope statement
C. change requests
D. process analysis
解析與討論:http://m.xiexiliangjiufa.com/st/275.html
參考答案:B
第4題:
Web Service體系結(jié)構(gòu)中包括服務(wù)提供者、( )和服務(wù)請(qǐng)求者三種角色。
A.服務(wù)認(rèn)證中心
B.服務(wù)注冊(cè)中心
C.服務(wù)協(xié)作中心
D.服務(wù)支持中心
解析與討論:http://m.xiexiliangjiufa.com/st/447.html
參考答案:B
第5題:
某單位計(jì)劃開發(fā)信息系統(tǒng)來(lái)實(shí)現(xiàn)其全員工資計(jì)算的自動(dòng)化,根據(jù)《軟件文檔管理指南GB/T16680-1996》,該信息系統(tǒng)項(xiàng)目中的文檔質(zhì)量等級(jí)最低應(yīng)達(dá)到( )。
A.4級(jí)
B.3級(jí)
C.2級(jí)
D.1級(jí)
解析與討論:http://m.xiexiliangjiufa.com/st/706.html
參考答案:A
第6題:
在某企業(yè)承建的一個(gè)信息系統(tǒng)集成項(xiàng)目中,建設(shè)方注重交付時(shí)間和質(zhì)量,承建方公司老總注重項(xiàng)目利潤(rùn),質(zhì)量監(jiān)控部經(jīng)理注重項(xiàng)目的質(zhì)量,人力資源部經(jīng)理注重項(xiàng)目人力使用效率。下列圍繞項(xiàng)目干系人管理的敘述錯(cuò)誤的是( )。
A.各項(xiàng)目干系人的目標(biāo)可能是相互矛盾的
B.在項(xiàng)目不同階段,干系人的要求要有不同的優(yōu)先級(jí)別
C.重點(diǎn)考慮客戶要求,人力資源部經(jīng)理意見可忽略
D.當(dāng)質(zhì)量、進(jìn)度、成本目標(biāo)發(fā)生矛盾時(shí),項(xiàng)目經(jīng)理要進(jìn)行平衡
解析與討論:http://m.xiexiliangjiufa.com/st/723.html
參考答案:C
第7題:
圖2右側(cè)是單代號(hào)網(wǎng)絡(luò)圖(單位為工作日),左側(cè)是圖例。在確保安裝集成活動(dòng)盡早開始的前提下,軟件開發(fā)活動(dòng)可以推遲( )個(gè)工作日。
圖2
A.0
B.1
C.2
D.4
解析與討論:http://m.xiexiliangjiufa.com/st/907.html
參考答案:B
第8題:
A ( ) is a dedicated storage network that provides access to consolidated,block level storage.It is primarily used to mark storage devices accessible to servers so that the devices appear as locally attached to the operating system.
A.network-attached storage
B.storge area network
C.direct attached storage
D.computer cluster
解析與討論:http://m.xiexiliangjiufa.com/st/941.html
參考答案:B
第9題:
某公司對(duì)本單位負(fù)責(zé)的信息系統(tǒng)集成項(xiàng)目實(shí)施失敗原因進(jìn)行分析后,發(fā)現(xiàn)約80%的原因都是用戶需求不明確、授權(quán)不清晰、以及采用了不適宜的技術(shù),而其他十幾種原因造成的失敗較少。根據(jù)這些分析結(jié)果,該公司所采用項(xiàng)目質(zhì)量控制的方法是( )。
A.散點(diǎn)圖法
B.直方圖法
C.帕累托法
D.控制圖法
解析與討論:http://m.xiexiliangjiufa.com/st/1084.html
參考答案:C
第10題:
( )屬于要約。
A.商場(chǎng)的有獎(jiǎng)銷售活動(dòng)
B.商業(yè)廣告
C.寄送的價(jià)目表
D.招標(biāo)公告
解析與討論:http://m.xiexiliangjiufa.com/st/1353.html
參考答案:A
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過(guò)深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |