試題1
當(dāng)組織項目管理能力比較強(qiáng)時,能夠顯著提高組織戰(zhàn)略能力,但它不一定能:查看答案
試題參考答案:D
試題2
指導(dǎo)、激勵和帶領(lǐng)團(tuán)隊所需的知識、技能和行為,可以幫助組織達(dá)成業(yè)務(wù)目標(biāo),這是:查看答案
試題參考答案:B
試題3
項目按時在預(yù)算內(nèi)交付,且符合客戶需求。但是,就在驗收后的三個月,客戶對產(chǎn)品表示不滿,并提出一個設(shè)計變更。在項目收尾期間,項目經(jīng)理應(yīng)如何處理以預(yù)防這個問題?查看答案
試題參考答案:B
試題4
A project manager for a global company for a global company is responsible for several projects with team members located worldwide.How can the project manager ensure that information is delivered to every team member in a timely manner?查看答案
試題參考答案:B
試題5
An experienced project manager joins a project that has been ongoing for six months. During their first meeting with stake holder,the project manager learns of a customer concern t hat their expectations are not being met. What should the project manager reference to address this concern?查看答案
試題參考答案:D
試題6
在項目執(zhí)行階段,一項變更已獲得批準(zhǔn),變更實施需要使用當(dāng)前項目團(tuán)隊中沒有的額外技能資源。該資源和項目團(tuán)隊并不在一個城市,項目經(jīng)理該怎么做?查看答案
試題參考答案:C
試題7
A project manager for a large manufacturing concern is working on a project that calls for a building to be constructed to house a new clean system manufacturing process that is critical to the success of the project. Construction is not a core competency of his company. His team has the ability to create a detailed procurement statement of work, with penalties if specific statements of work deliverables are not met. He is in the Plan Procurements process, evaluating which contract would work the best. Which of the following is the BEST type of contract for this situation?查看答案
試題參考答案:A
試題8
一家公司考慮進(jìn)行開發(fā)新移動應(yīng)用的一個項目。因為目前還不清楚目標(biāo)用戶將如何使用該應(yīng)用,公司決定開發(fā)一個早期版本只有必備功能的增量,。若用戶反饋積極,則使用預(yù)測性項目管理方法推進(jìn)全面開發(fā)。手機(jī)應(yīng)用的提前發(fā)布代表了什么?查看答案
試題參考答案:B
試題9
使用統(tǒng)計方法,確定對質(zhì)量成本的影響,是∶查看答案
試題參考答案:B
試題10
項目成功需要考慮系統(tǒng)的影響。系統(tǒng)因素包括如下各項,除了_____。查看答案
試題參考答案:D
信管網(wǎng)訂閱號
信管網(wǎng)視頻號
信管網(wǎng)抖音號
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評論 查看完整評論 | |