試題1
以下測(cè)量活動(dòng)中,()屬于服務(wù)技術(shù)測(cè)量查看答案
試題參考答案:C
試題2
網(wǎng)絡(luò)設(shè)計(jì)工作包括()。查看答案
試題參考答案:C
試題3
PCDA(Deming cycle)is an iterative four-step management method used in continual improment of processes and products.During the()phase,the data and results gathered from the do phase are evaluated.Data is compared to the expected outcomes to see any similarities and differences.
A、plan
B、do
C、check
D、act
查看答案
試題參考答案:C
試題4
運(yùn)維服務(wù)質(zhì)量策劃的內(nèi)容不包括:()查看答案
試題參考答案:C
試題5
The ITIL service life cycle consists of five publications. Which of the following is not include?()查看答案
試題參考答案:D
試題6
下面不是IT服務(wù)部署實(shí)施驗(yàn)收階段的關(guān)鍵成功因素的是()。查看答案
試題參考答案:D
試題7
()屬于IT服務(wù)部署實(shí)施,驗(yàn)收階段的活動(dòng)查看答案
試題參考答案:B
試題8
The type of measurement index does not include which()查看答案
試題參考答案:B
試題9
對(duì)服務(wù)臺(tái)人員進(jìn)行績(jī)效考核時(shí)發(fā)現(xiàn),某服務(wù)臺(tái)工程師一線解決率低于平均值, 對(duì)其進(jìn)行績(jī)效考核成果分析,結(jié)果表明該服務(wù)臺(tái)工程師個(gè)人能力不夠且積極性較差。 針對(duì)該考核結(jié)果,不宜采?。?nbsp; )方式進(jìn)行改進(jìn)。查看答案
試題參考答案:D
試題10
根據(jù)戰(zhàn)略規(guī)劃的一般理論,IT戰(zhàn)略規(guī)劃始于對(duì)信息技術(shù)內(nèi)外部環(huán)境(現(xiàn)狀)的分析,其終極任務(wù)是()。查看答案
試題參考答案:A
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |