PMP?每日一練試題內(nèi)容(2022/12/16)
試題1
項(xiàng)目團(tuán)隊(duì)剛剛得到發(fā)起人對范圍說明書的批準(zhǔn)。下一步應(yīng)該怎么做?查看答案
試題參考答案:B
試題2
項(xiàng)目A己處于執(zhí)行階段兩周時(shí)間,這時(shí)項(xiàng)目經(jīng)理發(fā)現(xiàn)一些關(guān)鍵資源沒有在為項(xiàng)目任務(wù)工作,項(xiàng)目經(jīng)理了解到,由于項(xiàng)目B落后于進(jìn)度計(jì)劃,職能經(jīng)理讓這些資源先專注于那些任務(wù)。項(xiàng)目經(jīng)理下一步應(yīng)該怎么做?查看答案
試題參考答案:C
試題3
The project manager has a list of success criteria provided by different stakeholders at the beginning of the project. The project manager is uncertain how to prioritize the success criteria and must present the project charter in a meeting tomorrow. What should the project manager do next?()查看答案
試題參考答案:A
試題4
一項(xiàng)影響項(xiàng)目成本基準(zhǔn)的新功能獲得批準(zhǔn),項(xiàng)目相關(guān)方表示,在批準(zhǔn)之前,他們并未獲得此進(jìn)展的通知。若要解決這個(gè)問題,必須更新哪—份計(jì)劃?查看答案
試題參考答案:C
試題5
一個(gè)設(shè)備零件制造公司新簽約了一個(gè)客戶,需要公司完成多個(gè)組件的制造,所有組件的范圍是清晰的,但是該客戶與公司第一次合作,想要提供高質(zhì)量的產(chǎn)品,客戶的要 一個(gè)組件完成并進(jìn)行驗(yàn)收后,才會(huì)支付下一個(gè)組件的費(fèi)用,若驗(yàn)收不通過,則會(huì)終止與公司的合作。項(xiàng)目經(jīng)理應(yīng)該使用哪種方法最合適?查看答案
試題參考答案:C
試題6
項(xiàng)目已經(jīng)到達(dá)一個(gè)重要的里程碑,進(jìn)入下一個(gè)階段之前,項(xiàng)目經(jīng)理安排一次與項(xiàng)目團(tuán)隊(duì)的會(huì)議,并讓項(xiàng)目相關(guān)方參與,記錄經(jīng)驗(yàn)教訓(xùn)。在這次會(huì)議上,項(xiàng)目經(jīng)理應(yīng)使用什么?查看答案
試題參考答案:A
試題7
項(xiàng)目經(jīng)理監(jiān)控一個(gè)關(guān)鍵工作包的執(zhí)行。項(xiàng)目經(jīng)理了解到該工作包的供應(yīng)商在前一個(gè)項(xiàng)目中出現(xiàn)過質(zhì)量問題。為避免當(dāng)前項(xiàng)目出現(xiàn)該問題,項(xiàng)目經(jīng)理對該供應(yīng)商實(shí)施了質(zhì)量審計(jì)。項(xiàng)目經(jīng)理在執(zhí)行以下哪項(xiàng)工作?查看答案
試題參考答案:D
試題8
項(xiàng)目經(jīng)理負(fù)責(zé)管理一個(gè)處于熱行階段的項(xiàng)目,在審查可用項(xiàng)目文伴時(shí),項(xiàng)目經(jīng)理注意到業(yè)務(wù)需求、工作范圍和供應(yīng)商規(guī)范的不一致之處,項(xiàng)目經(jīng)理應(yīng)該怎么做?查看答案
試題參考答案:D
試題9
在項(xiàng)目進(jìn)度網(wǎng)絡(luò)圖中,你可以發(fā)現(xiàn)多種時(shí)差。在某特定活動(dòng)中被使用且不影響任何后續(xù)活動(dòng)最早開始時(shí)間的時(shí)差被稱為∶查看答案
試題參考答案:B
試題10
A project manager deals with two functional managers that both claim ownership of a certain deliverable. What document can the project manager refer to that will clarify this issue?項(xiàng)目經(jīng)理正與兩名都聲稱對某一特定可交付成果擁有所有權(quán)的職能經(jīng)理交涉。項(xiàng)目經(jīng)理可以查閱哪一份說明該問題的文件?查看答案
試題參考答案:B
信管網(wǎng)訂閱號(hào)
信管網(wǎng)視頻號(hào)
信管網(wǎng)抖音號(hào)
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評論 查看完整評論 | |