信息系統(tǒng)項(xiàng)目管理師每日一練試題內(nèi)容(2025/3/13)
試題1
監(jiān)控變更管理過(guò)程是()的職責(zé)。查看答案
試題參考答案:B
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/13
試題2
CIA三要素不包括()。查看答案
試題參考答案:D
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/13
試題3
In the process of communication requirement analysis, the project manager should consider the number of potential communication channels or paths as an indicator of the complexity of a project’s communication. According to Metcalfe’s Law, a project with 10 stakeholders has ( ) potential communication channels.
A、10
B、45
C、50
D、100
查看答案
試題參考答案:B
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/13
試題4
()提供了一種結(jié)構(gòu)化方法以便使風(fēng)險(xiǎn)識(shí)別的過(guò)程系統(tǒng)化、全面化,使組織能夠在統(tǒng)一的框架下進(jìn)行風(fēng)險(xiǎn)識(shí)別,提高組織風(fēng)險(xiǎn)識(shí)別的質(zhì)量。查看答案
試題參考答案:C
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/13
試題5
變更管理是為了使得()與項(xiàng)目實(shí)際執(zhí)行情況相一致,是應(yīng)對(duì)項(xiàng)目變化的一套管理方法。查看答案
試題參考答案:C
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/13
試題6
根據(jù)《中華人民共和國(guó)政府采購(gòu)法》,針對(duì)( )情況,不能使用單一來(lái)源方式采購(gòu)。
A.只有唯一的供應(yīng)商可滿足采購(gòu)需求
B.招標(biāo)后沒(méi)有供應(yīng)商投標(biāo)
C.發(fā)生了不可預(yù)見(jiàn)的緊急情況不能從其他供應(yīng)商處采購(gòu)
D.必須保證原有采購(gòu)項(xiàng)目一致性或者服務(wù)配套的要求,需要繼續(xù)從原供應(yīng)商處添購(gòu),且添購(gòu)資金總額不超過(guò)原合同采購(gòu)金額百分之十
查看答案
試題參考答案:B
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/13
試題7
以下關(guān)于UML(Unified Modeling Language,統(tǒng)一建模語(yǔ)言)的敘述中,不正確的是:()查看答案
試題參考答案:C
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/13
試題8
項(xiàng)目管理是主動(dòng)的,組織項(xiàng)目績(jī)效是可預(yù)測(cè)的。項(xiàng)目團(tuán)隊(duì)遵循組織建立的0PM流程,這些流程根據(jù)項(xiàng)目的復(fù)雜性和從業(yè)者的能力加以裁剪。0PM流程在組織上是標(biāo)準(zhǔn)化的、可測(cè)量的、可控制的,并可由組織進(jìn)行分析,以監(jiān)控0PM流程績(jī)效是( )的特點(diǎn)。查看答案
試題參考答案:C
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/13
試題9
關(guān)于控制成本數(shù)據(jù)分析技術(shù)的描述,不正確的是:()。查看答案
試題參考答案:C
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/13
試題10
The scope management plan is how the team will prepare the()a document that includes descriptions of create the WBS, verify completion of the project deliverables, and control requests for changes to the project scope.
A.project charter
B.project scope goal
C.project budget
D.project scope statement
查看答案
試題參考答案:D
試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/13
信管網(wǎng)訂閱號(hào)
信管網(wǎng)視頻號(hào)
信管網(wǎng)抖音號(hào)
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門(mén)公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛(ài)好者、大學(xué)生提供專(zhuān)業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書(shū)、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專(zhuān)業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過(guò)深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |