1、 In project time management, activity definition is the process of identifying and documenting the specific action to be performed to produce the project deliverables. ()are not output of activity definition.
A.Activity list
B.Work Breakdown Structures
C.Activity Attributes
D.Milestone Lists
信管網(wǎng)參考答案:B
在項(xiàng)目時(shí)間管理中,活動定義是識別和記錄為產(chǎn)生項(xiàng)目可交付成果而采取的具體行動的過程。()不是活動定義的輸出。
A、 活動列表
B、 工作分解結(jié)構(gòu)
C、 活動屬性
D、 里程碑列表
查看解析:http://m.xiexiliangjiufa.com/st/2325527650.html
2、 The customer asks your project to be completed 6 months earlier than planned.You think this target can be reached by-overlapping project activities. This approach is known as ().
A.balance engjneering
B.fast-tracking
C.leveling
D.crashing
信管網(wǎng)參考答案:B
客戶要求您的項(xiàng)目比計(jì)劃提前6個(gè)月完成。您認(rèn)為通過重疊項(xiàng)目活動可以達(dá)到此目標(biāo)。這種方法被稱為()。
A、 平衡技術(shù)
B、 快速跟蹤
C、 分級
D、 趕工
查看解析:http://m.xiexiliangjiufa.com/st/2325620219.html
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評論 查看完整評論 | |