監(jiān)理單位在項目組織協(xié)調(diào)過程中,有關(guān)會議的描述錯誤的是()
A、監(jiān)理例會由總監(jiān)理工程師組織與主持
B、監(jiān)理專題會議可由總監(jiān)理工程師授權(quán)的監(jiān)理工程師主持
C、監(jiān)理專題會議的會議紀要可由總監(jiān)理工程師授權(quán)的監(jiān)理工程師簽認
D、應(yīng)該在會后 24 小時內(nèi)公布會議成果
The stages within the developement phase of the software life cycle are ( ).
A、design,analysis,implementation,and testing
B、analysis,design,implementation,and testing
C、analysis,design,testing,and implementation
D、design,analysis,testing,and implementation
which type of the backup process backs up files that have been modified since the last time all data was backed up?( )
A、Incremental backup
B、Full backup
C、Partial backup
D、Differential backup
”Cost of quality ” is a project management concept that includes cost of ( ).
A、exceedings requirements
B、Changed to the requirements
C、Ensuring conformance to requirements
D、The quality control requirements