第
69題: 在項(xiàng)目建設(shè)單位、承建單位、監(jiān)理單位三方之間,協(xié)調(diào)的結(jié)果一定是各方形成合力、解決存在的問題、推動(dòng)項(xiàng)目前進(jìn),這體現(xiàn)了溝通與協(xié)調(diào)的( )原則。
A.攜手共進(jìn)
B.信息共享
C.要點(diǎn)共識(shí)
D.目標(biāo)共同
答案解析與討論:
m.xiexiliangjiufa.com/st/4084417074.html第
70題: 在項(xiàng)目實(shí)施過程中,通過__可以使相關(guān)人員及時(shí)了解項(xiàng)目組在每個(gè)階段所完成的工作、與項(xiàng)目合同和計(jì)劃相吻合(或偏離)的情況、遺留問題以及建議等。
A.項(xiàng)目溝通計(jì)劃
B.項(xiàng)目績(jī)效報(bào)告
C.監(jiān)理實(shí)施細(xì)則
D.監(jiān)理規(guī)劃
答案解析與討論:
m.xiexiliangjiufa.com/st/4084522872.html第
71題: __concerns a cycle of organizational activity : the acquisition of information from one or more sources , the custodianship and the distribution of that information to those who need it , and its ultimate disposition through archiving or deletion
A.Data management
B.Information management
C.Content management
D.Knowledge management
答案解析與討論:
m.xiexiliangjiufa.com/st/408463691.html第
73題: The project management plan defines how the project is executed , monitored and controlled , and closed . it is progressively elaborated by updates ,and controlled and approved through the perform integrated __process.
A.Cost control
B.Schedule control
C.Change control
D.Risk control
答案解析與討論:
m.xiexiliangjiufa.com/st/4084821816.html第
74題: Change control within information technology (IT) systems is a formal process used to ensure that changes to product or system are introduced in a controlled and coordinated manner . It__the possibility that unnecessary changes will be introduced to a system without forethought.
A.Adds
B.Removes
C.Produces
D.Reduces
答案解析與討論:
m.xiexiliangjiufa.com/st/4084922119.html第
75題: ___seeks to build confidence that a future output or an unfinished output ,also known as work in progress will be completed in a manner that meet the specified requirements and expectations
A.Quality assurance
B.Product assurance
C.Service assurance
D.Output assurance
答案解析與討論:
m.xiexiliangjiufa.com/st/4085012339.html