試卷年份2012年上半年
試題題型【單選題】
試題內(nèi)容

進(jìn)度變更的控制活動(dòng)包括:( )。
A.判斷項(xiàng)目進(jìn)度的當(dāng)前狀態(tài),對(duì)造成進(jìn)度變更的因素施加影響,查明進(jìn)度是否已經(jīng)改變,在實(shí)際變更出現(xiàn)時(shí)對(duì)其進(jìn)行調(diào)整
B.判斷項(xiàng)目進(jìn)度的當(dāng)前狀態(tài),對(duì)造成成本變更的因素施加影響,查明進(jìn)度是否已經(jīng)改變,在實(shí)際變更出現(xiàn)時(shí)對(duì)其進(jìn)行管理
C.判斷項(xiàng)目進(jìn)度的當(dāng)前狀態(tài),對(duì)造成進(jìn)度變更的因素施加影響,查明進(jìn)度是否已經(jīng)改變,在實(shí)際變更出現(xiàn)時(shí)對(duì)其進(jìn)行管理
D.判斷項(xiàng)目進(jìn)度的當(dāng)前狀態(tài),對(duì)造成進(jìn)度變更的因素施加影響,查明進(jìn)度改變的原因,在實(shí)際變更出現(xiàn)時(shí)對(duì)其進(jìn)行調(diào)整

查看答案

相關(guān)試題

67題:

一個(gè)項(xiàng)目經(jīng)理和他的團(tuán)隊(duì)正在使用魚骨圖(Ishikawa圖)討論所發(fā)現(xiàn)的一個(gè)重大質(zhì)量問(wèn)題的原因,這屬于質(zhì)量管理中的( )。
A. 質(zhì)量計(jì)劃編制
B. 質(zhì)量工具
C. 質(zhì)量保證
D. 質(zhì)量控制

答案解析與討論:m.xiexiliangjiufa.com/st/937323.html

68題:

控制圖中的控制上限和控制下限標(biāo)明( )。
A.客戶將要接受的界限
B.可能出現(xiàn)的過(guò)程的偏差范圍
C.可以接受的過(guò)程的偏差范圍
D.判斷項(xiàng)目成敗的統(tǒng)計(jì)控制點(diǎn)

答案解析與討論:m.xiexiliangjiufa.com/st/938323.html

69題:

在變更管理中,“變更初審”的目的是( )。
A.確保評(píng)估所需信息準(zhǔn)備的必要性
B.在干系人間就提出供評(píng)估的變更信息達(dá)成共識(shí)
C.以項(xiàng)目基準(zhǔn)為評(píng)估依據(jù)
D.對(duì)變更實(shí)施進(jìn)行監(jiān)控

答案解析與討論:m.xiexiliangjiufa.com/st/939324.html

71題:

A (    ) is a dedicated storage network that provides access to consolidated,block level storage.It is primarily used to mark storage devices accessible to servers so that the devices appear as locally attached to the operating system.
A.network-attached storage
B.storge area network
C.direct attached storage
D.computer cluster

答案解析與討論:m.xiexiliangjiufa.com/st/941324.html

72題:

Information is no good to you if you can't (    ) it.The location dimension of information means having access to access to information no where you are.
A. access
B. make
C. learn
D. bring

答案解析與討論:m.xiexiliangjiufa.com/st/942325.html

73題:

Project manager believes that modifying the project scop may provide added value for the customer.The project manager should(    ).
A.change the scope baseline
B.contact the customer to determine if the change adds value
C.call a meeting of the change control board
D.change the project's objectives

答案解析與討論:m.xiexiliangjiufa.com/st/943325.html