信息系統(tǒng)項(xiàng)目管理師每日一練試題內(nèi)容(2021/5/2)
試題1: 項(xiàng)目經(jīng)理小李在制定進(jìn)度計(jì)劃時(shí)采用下圖所示的工具,該工具是()。
A、關(guān)鍵鏈法
B、關(guān)鍵路徑法
C、進(jìn)度網(wǎng)絡(luò)分析
D、建模技術(shù)
信息系統(tǒng)的生命周期可以分為立項(xiàng)、開發(fā)、運(yùn)維及消亡四個(gè)階段、《需求規(guī)格說(shuō)明書》在()階段形成。
A、立項(xiàng)
B、開發(fā)
C、運(yùn)維
D、消亡
In project management , a ( 1) is a listing of a project’s milestones, activities, and deliverables, usually with intended start and finish dates. Those items are often estimated in terms of resource (2 ) ,budget and duration, linked by dependencies and scheduled events.
(1)A. schedule
B. activity
C. plan
D. contractor
(2)A. finding
B. balance
C. allocation
D. distribution
系統(tǒng)集成合同管理是管理建設(shè)方和承建方的關(guān)系,保證承建方的實(shí)際工作滿足合同要求的過程,其內(nèi)容不包括()
A、合同簽訂管理
B、合同履行管理
C、合同變更管理
D、合同違約管理
項(xiàng)目范圍確認(rèn)是項(xiàng)目管理過程中的重要工作,( )是其使用的工具和技術(shù)
A、分解
B、專家判斷
C、檢查
D、偏差分析
IPV6協(xié)議規(guī)定,一個(gè)IP地址的長(zhǎng)度是()位。
A.32
B.64
C.128
D.256
A milestone is a significant () in a project.
A. activity
B. event
C. phase
D.process
在面向?qū)ο箝_發(fā)方法中,用UML表示軟件體系架構(gòu),用到5個(gè)視圖:邏輯視圖、構(gòu)件視圖、部署視圖、( )。
A.使用視圖和動(dòng)態(tài)視圖
B. 用例視圖和動(dòng)態(tài)視圖
C. 用例視圖和進(jìn)程視圖
D. 靜態(tài)視圖和動(dòng)態(tài)視圖
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |