PMP?每日一練試題內容(2022/9/25)
試題1
A project manager for a system upgrade project learns that the upgraded system does not perform as expected. To increase the system's performance, the project manager asks the vend or to change a component. The cost of the component change is not part of the project cost baseline.The funding for this new component should come from which of the following?查看答案
試題參考答案:B
試題2
項目經理識別出可能對一個戰(zhàn)略項目目標產生負面影響的多個問題。項目經理下一步應該怎么做?()查看答案
試題參考答案:A
試題3
A critical project resource resigns from the company.All other resources with the required skills are currently assigned to other projects. To mitigate the impact on the project schedule, what should the project manager do?查看答案
試題參考答案:C
試題4
企業(yè)有多個不同層面的項目需要執(zhí)行,而且這些項目需要不同技術知識,以下哪種組織類型最有效?查看答案
試題參考答案:D
試題5
客戶不滿意承包商提供的技術數據,要求提供額外的項目績效信息。若要避免這個問題,承包商應該事先審查哪—項?查看答案
試題參考答案:B
試題6
敏捷團隊正在從事創(chuàng)造一項新產品的任務,團dui已經創(chuàng)造了新產品,但由于一項特殊的需求,完成迭代很困難,團隊應該怎么做?查看答案
試題參考答案:D
試題7
由于三天前出現(xiàn)的問題沒有得到解決,所以沖刺中計劃好的任務未能完成。項目經理希望在未來防止這種情況的發(fā)生。項目經理應該做什么?查看答案
試題參考答案:A
試題8
某項目經理受命承擔一個項目,并且目前通過團體活動制定該項目的需求基線??刹捎煤畏N團體活動方法?查看答案
試題參考答案:B
試題9
你是項目管理辦公室的主任,剛為某個項目委派了一名項目經理。他是第一次擔任項目經理,正在為即將開始的項目章程編制工作征求你的意見。你可以給他的建議是()。查看答案
試題參考答案:A
試題10
由于其他項目快要提前完工,客戶出現(xiàn)了資金流問題??蛻舾嬖V項目經理,他的項目資金到位時間會有限制。目前項目的CPI是1.02.完工估算是927000美元。如果項目經理打算解決資金到位的限制,他最可能對以下哪項內容進行變更?()查看答案
試題參考答案:D
信管網訂閱號
信管網視頻號
信管網抖音號
溫馨提示:因考試政策、內容不斷變化與調整,信管網網站提供的以上信息僅供參考,如有異議,請以權威部門公布的內容為準!
信管網致力于為廣大信管從業(yè)人員、愛好者、大學生提供專業(yè)、高質量的課程和服務,解決其考試證書、技能提升和就業(yè)的需求。
信管網軟考課程由信管網依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學員考試保駕護航。面授、直播&錄播,多種班型靈活學習,滿足不同學員考證需求,降低課程學習難度,使學習效果事半功倍。
發(fā)表評論 查看完整評論 | |