PMP?每日一練試題內容(2023/5/8)
試題1
Your cost forecast shows that you will have a cost overrun at the end of the project. Which of the following should you do?查看答案
試題參考答案:A
試題2
While facilitating a stand-up,the project manager learns that a product acquired for the project is incompatible with the selected software version. There is a considerable amount of work required to make the product compatible. What should the project manager do first?查看答案
試題參考答案:C
試題3
A project's budget at completion(BAC) is USS 100,000.Current project reports show it is on schedule and on budget. A team member performed a bottom-up estimate of the relevant work package, which indicates that the remaining work will require US$10,000 less than originally planned and ca n still be delivered on schedule. What is the estimate at completion(EAC)?查看答案
試題參考答案:A
試題4
Due to defects. the company's latest project receives negative customer reviews. Which tools and techniques should the project manager have used to reduce the defects?()查看答案
試題參考答案:B
試題5
John is managing a team of 8 team members distributed across two different locations(4 at each location).He is considering to use Agile methods but confused as Agile methods have great emphasis over co-location.What is your advise to him?約翰管理著一個8人的團隊,其中4人在一個地方工作,另外4人在另一個地方工作。他想采用敏捷方法,但明白敏捷方法要求團隊要共處—地。你會給他什么建議?查看答案
試題參考答案:C
試題6
A raw material being used as part of the product deliverable may not comply with quality standards.The probability of a risk occurrence is low:however.he impact is high because the company would absorb the cost of the vendor's mistake. There is on approved secondary supplier.查看答案
試題參考答案:C
試題7
敏捷團隊有一個預先制定的計劃,以固定節(jié)奏為期三周的sprint工作,每兩次sprint后,邀請干系人審查進展情況。產品負責人應如何確保團隊為客戶提供價值?查看答案
試題參考答案:C
試題8
在項目中途.一名新項目經(jīng)理加入團隊.指導委員會要求更新其可交付成果的狀態(tài)以及跟蹤每個可交付成果,項目經(jīng)理應該查閱哪份文件?查看答案
試題參考答案:B
試題9
Although the quality control process was followed for a deliverable,the customers express displeasure with its quality. W hat should the project manager do first?查看答案
試題參考答案:D
試題10
下列哪一項包含了與偏差原因、選擇糾正措施的原因以及質量控制有關的信息?∶查看答案
試題參考答案:C
信管網(wǎng)訂閱號
信管網(wǎng)視頻號
信管網(wǎng)抖音號
溫馨提示:因考試政策、內容不斷變化與調整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權威部門公布的內容為準!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學生提供專業(yè)、高質量的課程和服務,解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學員考試保駕護航。面授、直播&錄播,多種班型靈活學習,滿足不同學員考證需求,降低課程學習難度,使學習效果事半功倍。
發(fā)表評論 查看完整評論 | |