信息系統(tǒng)項目管理師每日一練試題(2025/3/15)

信息系統(tǒng)項目管理師當天每日一練試題地址:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1

往期信息系統(tǒng)項目管理師每日一練試題匯總:m.xiexiliangjiufa.com/class/27/e1_1.html

信息系統(tǒng)項目管理師每日一練試題(2025/3/15)在線測試:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/15

點擊查看:更多信息系統(tǒng)項目管理師習題與指導

信息系統(tǒng)項目管理師每日一練試題內(nèi)容(2025/3/15)

  • 試題1

    招標投標是一種國際慣例,是一種()行為。
    A.資金流轉
    B.項目任務分解
    C.客戶關系維護
    D.商品交易

    查看答案

    試題參考答案:D

    試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/15

  • 試題2

    ()The process of determining,documenting, and managing stakeholder needs and requirements to meet Project objectives
    A、 Plan Scope Management
    B、 Collection Requirements
    C、 Validate Scope
    D、 Control Scope

    查看答案

    試題參考答案:B

    試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/15

  • 試題3

    () includes the processes required to ensure that the project includes all the work required , and only the work required , to compete the project successfully . Managing the project scope is primarily concerned with defining and controlling what is not included in the project.
    A、Create scope
    B、Project stakeholder management
    C、Preject scope management
    D、Project cost management

    查看答案

    試題參考答案:C

    試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/15

  • 試題4

    ()is a document generated by the creating WBS process that support the WBS,which provides more detailed descriptions of the components in the WBS.
    A、The project charter
    B、The project scope statement
    C、The WBS dictionary
    D、The activity list

    查看答案

    試題參考答案:C

    試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/15

  • 試題5

    ()is a grid that shows the project resources assigned to each work package.
    A.Stakeholder engagement assessment matrix
    B.Requirements traceability matrix
    C.Probability and impact matrix
    D.Responsibility assignment matrix

    查看答案

    試題參考答案:D

    試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/15

  • 試題6

    The key benefit of the Project () is that it determines whether to acquire goods and services from outside the project, if so, what to acquire as well as how and when to acquire it .
    A、Schedule management
    B、Change management
    C、Knowledge management
    D、Procurement Management

    查看答案

    試題參考答案:D

    試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/15

  • 試題7

    PDM includes four types of dependencies or precedence relationships

    (  ). The completion of the successor activity depends upon the initiation of the predecessor activity.
    A.Finish-to-Start
    B.Finish-to-Finish
    C.Start-to-Start
    D.Start-to-Finish

    查看答案

    試題參考答案:D

    試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/15

  • 試題8

    以下關于類和對象關系的敘述中,(  )是不正確的
    A、對象是類的實例
    B、類是對象的抽象
    C、類是靜態(tài)的,對象是動態(tài)的
    D、類和對象必須同時存在

    查看答案

    試題參考答案:D

    試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/15

  • 試題9

    The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned ,designed and built in, not ( ).
    A. executed in
    B. inspected in
    C. check-in
    D. look-in

    查看答案

    試題參考答案:B

    試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/15

  • 試題10

    During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing  requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may,  however, want  to  track appropriate measures  of requirements volatility to judge whether new or revised ( )are necessary.
    A. proceedings
    B. controls
    C. forecasting’s
    D. prelibations

    查看答案

    試題參考答案:B

    試題解析與討論:m.xiexiliangjiufa.com/exam/ExamDay.aspx?t1=1&day=2025/3/15

关闭

信息系统项目管理师三科一本通,包邮!

由于官方教材内容较多,没有考试重难点之分,并且不含案例论文内容,所以对官方教材看起来比较吃力的考生,也可以报班领取信管网《信息系统项目管理师三科一本通》!精品资料,通关之选!

信管網(wǎng)訂閱號

信管網(wǎng)視頻號

信管網(wǎng)抖音號

溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權威部門公布的內(nèi)容為準!

信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學生提供專業(yè)、高質(zhì)量的課程和服務,解決其考試證書、技能提升和就業(yè)的需求。

信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學員考試保駕護航。面授、直播&錄播,多種班型靈活學習,滿足不同學員考證需求,降低課程學習難度,使學習效果事半功倍。

相關內(nèi)容

發(fā)表評論  查看完整評論  

精選

課程

提問

評論

收藏

×
账号密码登录
短信验证码登录
  • 点击刷新
未注册用户将自动注册账号

微信扫描二维码,马上登录

没有账号,立即注册

其他登录方式:
×
关于我们  ┊  付款方式  ┊  联系我们  ┊  加入我们  ┊  网站声明  ┊  QQ学习群  ┊  网站地图  ┊  最近更新
客服热线:400-880-6318   QQ:800184589   微信:270019001   文章或图片如有侵权,请第一时间联系删除
Copyright ©2010-2022 信息化项目管理专业网站 - 信管网 All Rights Reserved 湘ICP备15005302号-9 湘公网安备 43010402000418号

预约信管网直播

  • 信管网视频号

  • 信管网抖音号

(周一至周五 16:30-17:30)

信管软考李老师

无特殊情况一般晚上8点直播

很高兴能和大家一路同行

下面是我的微信和抖音号,一起加油!

信管软考李老师

直播时间:晚上8点

免费观看

12年+

专业培训机构

PMI®注册

教育机构

10年+

专业教研团队

无忧保障,不

过免费重学

先试学,后报名,不过免费重学
提交即代表同意以手机号码开通试学账号及联系