女人久久久www免费人成看片,国内自拍偷拍网,国产一区二区三区免费在线观看,欧美精品三区四区,91久久国产综合久久91,欧美成人精品第一区二区三区 ,美女成人在线观看

軟題庫(kù) 學(xué)習(xí)課程
試卷年份2016年下半年
試題題型【單選題】
試題內(nèi)容

Murphy's Law suggests, "If anything can go wrong, it will." Murphy has motivated numerous pearls of wisdom about projects; machines, people, and why things go wrong. A project is a [temporary] sequence of unique, complex, and connected ( 1 ) having one goal or purpose and that must be completed by a specific time, within budget, and according to ( 2 ).Project management is the ( 3 ) of scoping, planning, staffing, organizing, directing, and controlling the development of an acceptable information system at a minimum cost within a specified time frame. Project management is a cross life cycle activity because it overlaps all phases of any systems development methodology.
For any systems development project, effective project management is necessary to ensure that the project meets the deadline, is developed within a (an) ( 4 ) budget, and fulfills customer expectations and specifications.
Corporate rightsizing has changed the structure and culture of most organizations, and hence, project management. More flexible and temporary interdepartmental(不同部門間)teams that are given greater responsibility and authority for the success of organizations have replaced rigid hierarchical command structures and permanent teams. Contemporary system development methodologies depend on having teams that include both technical and nontechnical users, managers, and information technologists all directed to the project goal. These ( 5 ) teams require leadership and project management.
(1) A.a(chǎn)ctivities
B.tasks
C.services
D.software
(2)A.document
B.order
C.specification
D.a(chǎn)uthority
(3)A.process
B.a(chǎn)ctivity
C.step
D.task
(4) A.predefined
B.a(chǎn)cceptable
C.rigid
D.Strict
(5)A.invariable
B.fixed
C.permanent
D.dynamic

查看答案

相關(guān)試題

64題: 系統(tǒng)運(yùn)行質(zhì)量評(píng)價(jià)是指從系統(tǒng)實(shí)際運(yùn)行的角度對(duì)系統(tǒng)性能和建設(shè)質(zhì)量等進(jìn)行的分析、評(píng)估和審計(jì)。針對(duì)系統(tǒng)的質(zhì)量評(píng)價(jià),下列說法中,不正確的是 (  ) 。
A.系統(tǒng)是否滿足了用戶和管理業(yè)務(wù)對(duì)信息系統(tǒng)的需求
B.系統(tǒng)的總體技術(shù)水平
C.系統(tǒng)實(shí)施前業(yè)務(wù)人員技術(shù)水平評(píng)估
D.系統(tǒng)功能的先進(jìn)性、有效性和完備性。答案解析與討論:m.xiexiliangjiufa.com/st/313305260.html

65題: 一般來說,用戶支持應(yīng)該首先確定用戶支持的范圍。下列說法中,(  ) 不包括在通常用戶支持的范圍之列。
A.軟件升級(jí)服務(wù)  
B.軟件技術(shù)支持服務(wù)
C.遠(yuǎn)程熱線支持服務(wù)   
D.軟件終身跨平臺(tái)操作答案解析與討論:m.xiexiliangjiufa.com/st/3133124551.html

66題: 關(guān)于幫助服務(wù)臺(tái)的職能,不正確的說法是(    )。
A.及時(shí)發(fā)現(xiàn)系統(tǒng)運(yùn)行中的錯(cuò)誤
B.接受客戶請(qǐng)求《電話、傳真、電子郵件等) 
C.記錄并跟蹤事故和客戶意見   
D.及時(shí)通知客戶其請(qǐng)求的當(dāng)前狀況和最新進(jìn)展答案解析與討論:m.xiexiliangjiufa.com/st/3133217569.html