試卷年份2018年下半年
試題題型【單選題】
試題內(nèi)容

( )techniques are used to find ways to bring project activities that are behind into alignment with the plan by fast tracking or crashing the schedule for the remaining work .
A. Schedule forecasts
B. Schedule compression
C. Change requests
D. Data analysis

查看答案

相關(guān)試題

68題: 監(jiān)理工程師在從事監(jiān)理工作時(shí),應(yīng)同建設(shè)單位和承建單位建立良好的人際關(guān)系,還需要?jiǎng)?chuàng)造人際交往的條件。監(jiān)理工程師小王采取積極的態(tài)度與項(xiàng)目經(jīng)理加強(qiáng)交往、增加交往頻率,這是通過( )創(chuàng)造了良好的人際交往條件。
A.外表的親和度
B.態(tài)度的類似性
C.需求的互補(bǔ)性
D.時(shí)空上的接近
答案解析與討論:m.xiexiliangjiufa.com/st/4056324768.html

69題: 監(jiān)理單位應(yīng)在( )階段了解建設(shè)單位需求,協(xié)助建設(shè)單位確定招標(biāo)方式,并對(duì)招標(biāo)過程的組織提出建議。
A.準(zhǔn)備
B.系統(tǒng)需求分析
C.系統(tǒng)設(shè)計(jì)
D.系統(tǒng)實(shí)施
答案解析與討論:m.xiexiliangjiufa.com/st/4056425035.html

70題: 某系統(tǒng)集成企業(yè)在項(xiàng)目實(shí)施階段出現(xiàn)突發(fā)情況,引起進(jìn)度問題。此時(shí)監(jiān)理單位應(yīng)通過( ),督促各方采取應(yīng)急措施趕上進(jìn)度要求,以便項(xiàng)目的開發(fā)能以預(yù)期進(jìn)度完成。
A.監(jiān)理日?qǐng)?bào)
B.監(jiān)理周報(bào)
C.監(jiān)理月報(bào)
D.監(jiān)理專題會(huì)議
答案解析與討論:m.xiexiliangjiufa.com/st/405657128.html

72題: Generally, the contract claim can be settled amicably through negotiation. If no compromise can be reached, the dispute can be settled by ( ).
A. negotiation
B. the court
C. lawyer
D. arbitration
答案解析與討論:m.xiexiliangjiufa.com/st/4056723685.html

73題: The organization shall undertake change in a planned and systematic manner, taking account of the review of the potential consequences of changes and taking action as necessary, to ensure the integrity of goods and services are maintained. This is called ( ).
A. control of changes
B. control of plans
C. control of accounts
D. control of service
答案解析與討論:m.xiexiliangjiufa.com/st/4056822894.html

74題: Much of the effort of cost control involves analyzing the relationship between the consumption of project funds and the work being accomplished for such expenditures. The key to effective cost control is the management of the approved ( ).
A. schedule baseline
B. cost baseline
C. cost output
D. cost input
答案解析與討論:m.xiexiliangjiufa.com/st/4056914819.html