信息系統(tǒng)項目管理師每日一練試題內(nèi)容(2020/12/27)
試題1: 根據(jù)《GB/T 12504-90計算機軟件質(zhì)量保證計劃規(guī)范》的規(guī)定,為了確保軟件的實現(xiàn)滿足需求,需要的基本文檔不包括( )
A.軟件需求規(guī)格說明書
B. 軟件界面設(shè)計說明書
C.軟件驗證和確認報告
D.用戶文檔
()沖突管理方法是指綜合多方面的觀點和意見,得到一個多數(shù)人能夠接受的解決方案
A、強制
B、妥協(xié)
C、合作
D、回避
訪問控制是信息安全管理的重要內(nèi)容之一,以下關(guān)于訪問控制規(guī)則的敘述中,( )是不正確的
A、應(yīng)確保授權(quán)用戶對信息系統(tǒng)的正常訪問
B、防止對操作系統(tǒng)的未授權(quán)訪問
C、防止對外部網(wǎng)絡(luò)未經(jīng)授權(quán)進行訪問,對內(nèi)部網(wǎng)絡(luò)的訪問則沒有限制
D、訪問對應(yīng)用系統(tǒng)中的信息未經(jīng)授權(quán)進行訪問
The ( ) refers to the integration of complex physical machinery with networked sensors and software. It draws together fields such as machine learning, big data, the Internet of things and machine-to-machine communication to ingest data form machines, analyze it (often in real-time), and use it to adjust operations.
A. Industrial internet
B. factory internet
C. Industrial web
D. business internet
創(chuàng)建WBS的輸入包括( )。
A.項目管理計劃
B.成本估算
C.WBS模板
D.項目范圍管理計劃
某法院將罰沒的物品通過某拍賣網(wǎng)站對社會公開拍賣,成交后買方通過網(wǎng)絡(luò)支付將款項直接支付當(dāng)?shù)刎斦到y(tǒng),該活動屬于()的范疇。
A.電子政務(wù)
B.行政管理
C.電子商務(wù)
D.電子交易
A project life cycle is a collection of generally sequential project(1 )whose name and number are determined by the control needs of the organization or organizations involved in the project.The life cycle provides the basic (2 )for managing the project, regardless of the specific work involved.
(1)A. phases B. processes C. segments D. pieces
(2)A.plan B. fraction C. main D. framework
傳輸控制TCP協(xié)議和用戶數(shù)據(jù)報UDP協(xié)議是互聯(lián)網(wǎng)傳輸層的主要協(xié)議。下面關(guān)于TCP和UDP的說法中,( )是不正確的
A、TCP是面向連接的協(xié)議,UDP協(xié)議是無連接的協(xié)議
B、TCP能夠保證數(shù)據(jù)包到達目的地不錯序,UDP不保證數(shù)據(jù)的傳輸正確
C、TCP協(xié)議傳輸數(shù)據(jù)包的速度一般比UDP協(xié)議傳輸速度快
D、TCP保證數(shù)包傳輸?shù)恼_性,UDP在傳輸過程中可能存在丟包現(xiàn)象
The Perform Integrated Change Control process is conducted from project inception through completion and is the ultimate responsibility of the ().
A.Chang control board
B.Project management office
C.Project manager
D.Configuration management officer
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學(xué)員考試保駕護航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評論 查看完整評論 | |