信息系統(tǒng)項目管理師英語復習資料:項目費用管理(中英文對照)知識[3]
來源:信管網(wǎng) 2012年03月13日 【所有評論 分享到微信

 
7.2.2 Tools and Techniques for Cost Estimating (費用估算的工具和技術(shù))
.1 Analogous estimating. Analogous estimating, also called top-down estimating,
means using the actual cost of a previous, similar project as the basis for estimating
the cost of the current project. It is frequently used to estimate total project costs when
there is a limited amount of detailed info rmation about the project (e.g., in the early
phases). Analogous estimating is a form of expert judgment (described in Section
7.1.2.1).
.1 類比估算。類比估算也叫自上而下估算,就是利用以前類似的項目費用作為基礎(chǔ)估算當前項目的費用。當項目可用信息有限時(如項目的早期階段),常采用這種方法估算項目總費用。類比估算是專家判斷的一種形式(見7.1.2.1節(jié))。
 
Analogous estimating is generally less costly than other technique s, but it is also
generally less accurate. It is most reliable when (a) the previous projects are similar in
fact and not just in appearance, and (b) the individuals or groups preparing the
estimates have the needed expertise.
類比估算比其它方法便宜,但精度較低。在以下條件下它是可靠的:(a)以前的項目在實質(zhì)上而不是表面上相似,(b)進行估算的個人或團體有必需的專業(yè)技術(shù)。
 
.2 Parametric modeling. Parametric modeling involves using project
characteristics (parameters) in a mathemati cal model to predict project costs. Models
may be simple (residential home construction will cost a certain amount per square
foot of living space) or complex (one model of software development costs uses 13 separate adjustment factors each of which has 5-7 points on it).
.2 參數(shù)模型。參數(shù)模型法是將項目特點(參數(shù))用數(shù)學模型方式來預測項目費用。模型可以是簡單的(住宅建設(shè)每平方尺居住面積花費多少)或復雜的(軟件開發(fā)費用的一個模型使用13個單獨的調(diào)整因子,而每個因子又有5-7 個要素)。
 
Both the cost and accuracy of parametric models varies widely They are most
likely to be reliable when (a) the historical information used to develop the model was
accurate, (b) the parameters used in the m odel are readily quantifiable, and (c) the
model is scalable (i.e., it works as well for a very large project as for a very small
one).
參數(shù)模型法的費用和精度變化很大。它們在以下時候是可靠的:(a)用于開發(fā)模型的歷史信息是精確的,(b)模型中使用的參數(shù)被量化,(c)模型可按比例調(diào)整的(就是,大型項目和小型項目同樣使用)。
 
.3 Bottom-up estimating. This technique involves estimating the cost of
individual work items, then summarizing or rolling-up the individual estimates to get
a project total.
.3 自下而上估算。這個技術(shù)是先估算各個單位工作的費用,然后匯總單個費用得出項目整個費用。
 
The cost and accuracy of bottom-up estimating is driven by the size of the
individual work items: smaller work items increase both cost and accuracy The
project management team must weigh the additional accuracy against the additional
cost.
自下而上估算的精度和費用取決于單個工作項目的大?。?/div>
 
.4 Computerized too1s. Computerized tools such as project management
software and spreadsheets are widely used to assist with co st estimating. Such
products can simplify the use of the tools described above an d thereby facilitate rapid
consideration of many costing alternatives.
.4 電腦化工具。項目管理軟件和電子表格等電腦化工具廣泛用于輔助費用估算。這些產(chǎn)品簡化上述工具的使用,提高考慮多種替代方案的速度。
 
7.2.3 Outputs from Cost Estimating(費用估算的輸出)
.1 Cost estimates. Cost estimates are quantitative assessments of the likely costs
of the resources required to complete proj ect activities. They ma y be presented in
summary or in detai1.
.1 費用估算。費用估算是對完成項目工序所需的資源的可能費用的量化估計。它可以表達得很概括或詳細。
 
Costs must be estimated for all resources that will be charged to the project. This
includes, but is not limited to, labor, materials, supplies, and special categories such as
an inflation allowance or cost reserve.
必需對項目上支出的所有資源進行估算。它們包括,但不限于,人力、材料、設(shè)備和一些特殊種類,如通貨膨脹補貼或費用儲備等。
 
Cost estimates are generally expressed in units of currency (dollars, francs, yen,
etc.) in order to facilitate comparisons both within and across projects. Other units
such as staff hours or staff days may be used, unless doing so will misstate project
costs (e.g., by failing to differentiate among resources with very different costs). In
some cases, estimates will have to be provided using multiple units of measure in
order to facilitate appropriate management control.
費用估算一般以貨幣單位(美元、法郎、日元等)表示,以便項目內(nèi)或項目間進行比較。也可以采用其它一些單位,如工日和工時,除非這樣做會對費用估算產(chǎn)生誤解(比如,錯誤區(qū)分具有很大差別費用的資源)。在某些情況下,估算必需采用多種計量單位以有利于合適的管理控制。
 
Cost estimates may benefit from being refined during the course of the project to reflect the additional detail available. In some application areas, there are guidelines
for when such refinements should be made and what degree of accuracy is expected.
For example, AACE International has iden tified a progression of five types of
estimates of construction costs during engi neering: order of magnitude, conceptual,
preliminary definitive, and control.
費用估算收益于項目進展過程的細化結(jié)果,以便反映有利的輔助細節(jié)。在某些應(yīng)用領(lǐng)域,它們是何時進行這種細化和精確到什么程度的指南。例如,美國國際造價師協(xié)會已經(jīng)定義了工程中建設(shè)估算的五種級別:量級估算、概念估算、初步估算、最終估算和控制估算。
 
.2 Supporting detai1. Supporting detail for the cost estimates should include:
.2 輔助細節(jié)。費用估算的輔助細節(jié)包括:
 
z A description of the scope of work es timated. This is often provided by a reference to the WBS.
需要估算的工作范圍的描述。它通常由WBS的參考資料提供。
 
z Documentation of the basis for the estimate, i.e., how it was developed.
估算依據(jù)的文檔,即估算是如何編制的。
 
z Documentation of any assumptions made.
任何作做的假定的文檔。
 
z An indication of the range of possible results, for example, $10,000 ±
$l,000 to indicate that the item is expected to cost between $9,000 and
$11,000.
可能結(jié)果的范圍說明,例如,$10,000 ± $l,000表示該項目的期望費用在$9,000 和$11,000之間。
 
The amount and type of additional detail varies by application area. Retaining
even rough notes may prove valuable by pr oviding a better understanding of how the
estimate was developed.
輔助細節(jié)的數(shù)量和類型隨應(yīng)用領(lǐng)域變化。即便保留粗略的資料對更好理解估算的編制過程都被證明是很有價值的。
 
.3 Cost management plan. The cost management plan describes how cost
variances will be managed (e.g., different re sponses to major problems than to minor
ones). A cost management plan may be formal or informal, highly detailed or broadly
framed based on the needs of the project stake holders. It is a subsid iary element of the
overall project plan (d iscussed in Section 4.1.3.1).

.3 費用管理計劃。費用管理計劃描述如何管理費用偏差(大問題和小問題的應(yīng)對措施是不同的)。費用管理計劃可以是正式的或非正式的、非常詳盡的或粗略的,這取決于項目利害關(guān)系者的需要。費用管理計劃是整體項目計劃(見4.1.3.1 節(jié))的一個輔助要素。

[1]   [2]   [3]   [4]   
掃碼關(guān)注公眾號

溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準!

信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。

信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學員考試保駕護航。面授、直播&錄播,多種班型靈活學習,滿足不同學員考證需求,降低課程學習難度,使學習效果事半功倍。

相關(guān)內(nèi)容

發(fā)表評論  查看完整評論