試題1
根據(jù)《軟件文檔管理指南GB/T 16680-1996》,關(guān)于軟件文檔的歸檔工作,下列說法中( )是不正確的。
A. 軟件文檔必須在項(xiàng)目開發(fā)過程結(jié)束之后統(tǒng)一歸檔
B. 歸檔的文檔應(yīng)是經(jīng)過鑒定或評審的
C. 文檔應(yīng)簽署完整、成套、格式統(tǒng)一、字跡工整
D. 印制本、打印本以及各種報(bào)告應(yīng)裝訂成冊并按規(guī)定進(jìn)行編號簽署
查看答案
試題參考答案:A
試題2
( )is not the advantage of GERT (Graphical evaluation and review techniques)as compared with PERT (project evaluation and review techniques).
A. Allowing looping
B. Allowing for dummy tasks
C. Allowing branching
D. Allowing multiple project end results
查看答案
試題參考答案:B
試題3
某企業(yè)ERP項(xiàng)目擬采用公開招標(biāo)方式選擇系統(tǒng)集成商,2010年6月9日上午9時(shí),企業(yè)向通過資格預(yù)審的甲、乙、丙、丁、戊五家企業(yè)發(fā)出了投標(biāo)邀請書,規(guī)定投標(biāo)截止時(shí)間為2010年7月19日下午5時(shí)。甲、乙、丙、戊四家企業(yè)在截止時(shí)間之前提交投標(biāo)文件,但丁企業(yè)于2010年7月20日上午9時(shí)才送達(dá)投標(biāo)文件。評標(biāo)過程中,專家組確認(rèn):甲企業(yè)投標(biāo)文件有項(xiàng)目經(jīng)理簽字并加蓋公章,但無法定代表人簽字;乙企業(yè)投標(biāo)報(bào)價(jià)中的大寫金額與小寫金額不一致;丙企業(yè)投標(biāo)報(bào)價(jià)低于標(biāo)底和其他四家較多。以下論述不正確的是( )。
A.丁企業(yè)投標(biāo)文件逾期,應(yīng)不予接受
B.甲企業(yè)無法定代表人簽字,做廢標(biāo)處理
C.丙企業(yè)報(bào)價(jià)不合理,做廢標(biāo)處理
D.此次公開招標(biāo)依然符合投標(biāo)人不少于三個(gè)的要求
查看答案
試題參考答案:C
試題4
實(shí)施()是企業(yè)落實(shí)《中國制造2025》戰(zhàn)略規(guī)劃的重要途徑。查看答案
試題參考答案:C
試題5
( )can be considered as part of risk mitigation.
A. Risk identification
B. Purchasing insurance
C. Assessment of outcomes
D. Assessment of probabilities
查看答案
試題參考答案:D
試題6
以下采用單一來源采購方式的活動,( )是不恰當(dāng)?shù)摹?br />A. 某政府部門為建立內(nèi)部辦公系統(tǒng),已從一個(gè)供應(yīng)商采購了120 萬元的網(wǎng)絡(luò)設(shè)備,由于辦公地點(diǎn)擴(kuò)大,打算繼續(xù)從原供應(yīng)商采購15 萬元的設(shè)備
B. 某地區(qū)發(fā)生自然災(zāi)害,當(dāng)?shù)孛裾块T需要緊急采購一批救災(zāi)物資
C. 某地方主管部門需要采購一種市政設(shè)施,目前此種設(shè)施國內(nèi)僅有一家廠商生產(chǎn)
D. 某政府機(jī)關(guān)為升級其內(nèi)部辦公系統(tǒng),與原承建商簽訂了系統(tǒng)維護(hù)合同
查看答案
試題參考答案:A
試題7
The ( ) refers to the integration of complex physical machinery with networked sensors and software. It draws together fields such as machine learning, big data, the Internet of things and machine-to-machine communication to ingest data form machines, analyze it (often in real-time), and use it to adjust operations.
A. Industrial internet
B. factory internet
C. Industrial web
D. business internet
查看答案
試題參考答案:A
試題8
The IoT architecture can be divided into three layers. ( ) is the key layer to realize the foundational capabilities which support the electronic devices interact with physical world.查看答案
試題參考答案:A
試題9
( )不屬于知識產(chǎn)權(quán)的基本特征是。查看答案
試題參考答案:D
試題10
A公司的某項(xiàng)目即特開始,項(xiàng)目經(jīng)理估計(jì)該項(xiàng)目需12人天完成,如果出現(xiàn)問題耽擱則20人天完成,最快10人天完成。根據(jù)項(xiàng)目成本估計(jì)中的三點(diǎn)估算法。該項(xiàng)目預(yù)計(jì)花費(fèi)()人天。查看答案
試題參考答案:B
信管網(wǎng)訂閱號
信管網(wǎng)視頻號
信管網(wǎng)抖音號
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評論 查看完整評論 | |