PMP?每日一練試題內(nèi)容(2023/5/13)
試題1
由于項(xiàng)目經(jīng)理未能遵守項(xiàng)目范圍.項(xiàng)目發(fā)起人拒絕驗(yàn)收項(xiàng)目.若要核實(shí)這點(diǎn),項(xiàng)目經(jīng)理應(yīng)該查閱哪份文件?查看答案
試題參考答案:B
試題2
項(xiàng)目經(jīng)理正在嘗試建立一個(gè)產(chǎn)品從原產(chǎn)地到可交付成果記錄信息之間的聯(lián)系.下列哪—項(xiàng)將幫助項(xiàng)目經(jīng)理完成這項(xiàng)工作?查看答案
試題參考答案:D
試題3
A construction project is located in the tropics area,and the project's risk register includes the risk of flooding during the rainy season.Now that the rainy season is over, the project is nearing completion. Which tool or technology should be use d to manage this risk?查看答案
試題參考答案:B
試題4
You prepared an integrated project plan and a project schedule. You submitted it to the steering committee and it was app roved. Key stakeholders accepted the plan. It is time to distribute it. Both the project plan and schedule should be distributed to查看答案
試題參考答案:D
試題5
During a project's execution phase the production manager asks the project manager to incorporate a change that has bee n proven to significantly increase output. What should the project manager do first查看答案
試題參考答案:A
試題6
When closing the project. which of the following documents is the most critical for the project manager to archive?查看答案
試題參考答案:A
試題7
一名新項(xiàng)目經(jīng)理被分配到一個(gè)敏捷項(xiàng)目中。在第一次站會(huì)上,項(xiàng)目經(jīng)理主要到團(tuán)隊(duì)成員對(duì)完成項(xiàng)目感到焦慮,成員還因?yàn)槁毮芙?jīng)理的頻繁中斷和請(qǐng)求經(jīng)理分散。這屬于哪一種組織類型查看答案
試題參考答案:B
試題8
新項(xiàng)目經(jīng)理在項(xiàng)目中途加入團(tuán)隊(duì),項(xiàng)目有5位有影響力的相關(guān)方和30名項(xiàng)目團(tuán)隊(duì)成員,項(xiàng)目經(jīng)理希望向團(tuán)隊(duì)更新項(xiàng)目狀態(tài)。項(xiàng)目經(jīng)理應(yīng)該參考什么?查看答案
試題參考答案:A
試題9
A performance report indicates a variation from a product's specifications. The project manager calls an emergency meeting during which all team members offer suggestions for the possible cause of the variance. What tool or technique is the team using?查看答案
試題參考答案:B
試題10
A company is going through a reorganization。Although not all new positions are known yet,organizational changes are already being communicated. What should the project manager do?查看答案
試題參考答案:B
信管網(wǎng)訂閱號(hào)
信管網(wǎng)視頻號(hào)
信管網(wǎng)抖音號(hào)
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |