信息系統(tǒng)項(xiàng)目管理師每日一練試題內(nèi)容(2018/7/23)
試題1: Many of the activities performed during the preliminary investigation are still being conducted in(1 ), but in much greater depth than before. During this phase, the analyst must become fully aware of the(2 ) and must develop enough knowledge about the(3 ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4 ) for process and data of current system, the deliverable from this phase also includes the(5 ) for the proposed system.
(1)A. analysis phase
B. design phase
C. implementation phase
D. maintenance phase
(2)A. main symptom
B. root problem
C. final blueprint
D. data specification
(3)A. hardware environment
B. testing environment
C. software environment
D. business environment
(4)A. logical models
B. physical models
C. design models
D. implementation models
(5)A. hardware and software specification
B. system performance specification
C. formal requirements definition
D. general problem statement
在描述復(fù)雜關(guān)系時(shí),圖形比文字?jǐn)⑹鰞?yōu)越得多,下列四種圖形工具中,不適合需求分析階段使用的是( )
A. 層次方框圖
B. 用例圖
C. IPO圖
D. N_S圖
甲乙兩個(gè)公司在項(xiàng)目實(shí)施過程中,對合同的生效時(shí)間產(chǎn)生了分歧。仲裁機(jī)構(gòu)調(diào)查時(shí)發(fā)現(xiàn)以下事實(shí):①雙方簽署的合同上并沒有對合同的生效日期做出規(guī)定;②雙方簽署合同的過程如下:乙公司在擬定好合同文本并簽署后以郵寄的方式寄給甲公司,信封上蓋有乙公司所在地郵局3月18日的郵戳,甲公司于3月20日收到合同文本,甲公司簽署合同后,將合同回寄給乙公司,信封帶有甲公司所在地3月22日的郵戳,乙公司于3月25日收到合同。仲裁機(jī)構(gòu)應(yīng)判定( )作為合同生效的日期。
A.3月18日 B.3月20日 C.3月22日 D.3月25日
某企業(yè)需要采用甲、乙、丙三種原材料生產(chǎn)Ⅰ、Ⅱ兩種產(chǎn)品。生產(chǎn)兩種產(chǎn)品所需原材料數(shù)量、單位產(chǎn)品可獲得利潤以及企業(yè)現(xiàn)有原材料數(shù)如表所示:
則公司可以獲得的最大利潤是(1)萬元。取得最大利潤時(shí),原材料(2)尚有剩余。
(1)A.21 B.34 C.39 D.48
(2)A.甲 B.乙 C.丙 D.乙和丙
某政府部門擬利用中央財(cái)政資金建設(shè)電子政務(wù)項(xiàng)目,關(guān)于建設(shè)方的立項(xiàng)管理,下列做法中不符合有關(guān)規(guī)定的是( )。
A.建設(shè)單位在編制項(xiàng)目建議書時(shí)專門組織項(xiàng)目需求分析,形成需求分析報(bào)告,報(bào)送項(xiàng)目審批部門
B.建設(shè)方在項(xiàng)目建議書獲得批復(fù)后,招標(biāo)選定有資格的第三方工程咨詢機(jī)構(gòu)編制可行性研究報(bào)告,報(bào)送項(xiàng)目審批部門
C.建設(shè)方在可行性研究報(bào)告獲得批復(fù)后,向有關(guān)部門申請項(xiàng)目前期工作經(jīng)費(fèi),前期工作經(jīng)費(fèi)計(jì)入項(xiàng)目總投資
D. 建設(shè)方在可行性研究報(bào)告獲得批復(fù)后,委托有資格的第三方工程咨詢機(jī)構(gòu)出具評估意見,連同批復(fù)的項(xiàng)目建議書,作為項(xiàng)目建設(shè)的主要依據(jù)
A project life cycle is a collection of generally sequential project(1 )whose name and number are determined by the control needs of the organization or organizations involved in the project.The life cycle provides the basic (2 )for managing the project, regardless of the specific work involved.
(1)A. phases B. processes C. segments D. pieces
(2)A.plan B. fraction C. main D. framework
建立一個(gè)概率模型或者隨機(jī)過程,使它的參數(shù)等于問題的解,然后通過對模型或過程的觀察計(jì)算所求參數(shù)的統(tǒng)計(jì)特征,最后給出所求問題的近似值,解的精度可以用估計(jì)值的標(biāo)準(zhǔn)差表示。這種技術(shù)稱為( )方法
A 期望貨幣分析
B 決策樹分析
C 蒙特卡洛分析
D 優(yōu)先順序圖
質(zhì)量保證是項(xiàng)目管理中非常重要的活動,質(zhì)量保證除了為項(xiàng)目提供支持外,還為()創(chuàng)造了條件。
A、產(chǎn)品改進(jìn)
B、過程改進(jìn)
C、質(zhì)量控制
D、成本控制
代理服務(wù)器防火墻主要使用代理技術(shù)來阻斷內(nèi)部網(wǎng)絡(luò)和外部網(wǎng)絡(luò)之間的通信,達(dá)到隱蔽內(nèi)部網(wǎng)絡(luò)的目的。以下關(guān)于代理服務(wù)器防火墻的敘述中,()是不正確的。
A.僅“可以信賴的”代理服務(wù)才允許通過
B.由于已經(jīng)設(shè)立代理,因此任何外部服務(wù)都可以訪問
C.允許內(nèi)部主機(jī)使用代理服務(wù)器訪問Internet
D.不允許外部主機(jī)連接到內(nèi)部安全網(wǎng)絡(luò)
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評論 查看完整評論 | |